TEE 15 SOUTH: SMOOTHING, RETAPING AND FINISHING OF THE ENTIRE TEE WITH STONE PLASTERED WALL
TEE 12 NORTH: THE TEE HAS BEEN RE-DONE WITH BERMUDA GRASS FINISHED WITH A CEMENT CURB, A WATERWAY AND THE RAILING HAS BEEN TREATED TO PREVENT ITS CORROSION.
CLUB HOUSE GARDEN: REDMODELED FROM THE ENTRANCE TO THE CADDY MASTER WITH A STONE WALL AND FLOWERS, DEFINING THE ENCLOUSURE WITH A MESH AND A FENCE.
HOLE 2 SOUTH: AFTER REQUESTING THE PERMITS TO THE CITY COUNCIL WE COULD FINALLY PRUNED THE TREES THAT WERE FACING THE STREET.
HOLE 1 NORTH: TO AVOID BALLS HITTING THE HOUSES TO THE RIGHT WE HAVE ADDED MORE PALM TREES, ADDING A TOTAL OF FIFTEEN. TO SEPARATE THE FIRST HOLE FROM THE DRIVING RANGE WE WILL BE PLANTING SEVEN CASUARINAS TOWARDS THE TEE, FOLLOWING THE EXISTING ONES.
HOLE 2 NORTH: THERE WAS AN EMPTY SPACE ON THE SIDE OF THE PATH THAT HAS BEEN FILLED UP. THE DRAIN HAS BEEN CLOSED WITH A GRILLE.
HOLE 1 NORTH AND HOLE 1 SOUTH: WE HAVE RENOVATED ALL THE FLOWERS ON BOTH PATHS.
course committee